Home » As More Parts Roll in, The Project Begins

As More Parts Roll in, The Project Begins

The Hydraulic Pack and Cabin of the Shear Baler has now also arrived at ELV Select Inc. Meaning we now have 3 pieces altogether: The Hopper, The Operating Cabin and the Hydraulic Pack.

The Operating Cabin has already come a long way, as it has already been straightened out, repaired and prepped for paint and painted. Today’s challenge was working with a high gloss enamel mixed into the paint, which requires you to work fast and to mix small amounts at a time since it doesn’t take long for the chemical reaction to happen, causing the paint to solidify. Here is a before and after:


As good as new!